
Kitchens
The room everybody ends up in
Layout first, then cabinets, then finishes. Toronto kitchens are often small, in narrow houses with a wall in the wrong place. We plan around what the house will allow, including the services behind the walls.
Home renovations in Toronto: kitchens, bathrooms, basement renovation and whole-floor changes, planned around the house you already have.

A semi on a narrow lot, a bungalow with a basement waiting, a century home with walls that are not where the drawings say. Renovation in Toronto means working with what is behind the plaster. We plan for it, and tell you early.
Kitchen and bath renovation, basement finishing, interior remodeling and layout changes, all run to one scope.

The room everybody ends up in
Layout first, then cabinets, then finishes. Toronto kitchens are often small, in narrow houses with a wall in the wrong place. We plan around what the house will allow, including the services behind the walls.

Small rooms, many trades
Plumbing, waterproofing, tile, ventilation and electrical, in a room that is often under three square metres. Planned well, they feel larger than they are.

Basement renovation Toronto
Extra living space, a rental unit, a place for the kids. We start with the walls and floor: any moisture should be understood before anything is covered up. Ceiling height, egress and permits are part of the plan.

Stairs, floors, trim, rooms
New stair treads, a replaced floor, a reworked built-in, a room opened up. Detail work is where a renovation looks like it belongs to the house.

When most of a floor changes
Main floor, second floor, or the whole house. These jobs need a sequence: structure, services, then finishes. We plan the order so the house stays as usable as it can.

Taking out a wall, moving a stair
Opening up a plan can change how a house feels. It can also involve engineering, permits and inspections, depending on what the wall is carrying. We tell you early what is involved, and who needs to sign off.
We walk the house with you. What bothers you, what you want to keep, what the plans do not show. Older Toronto houses usually have a surprise or two.
A written scope with the rooms, the trades, the finishes you have chosen and the items still open. Allowances are labelled as allowances.
Permits and drawings where the work needs them, long-lead materials ordered, and a sequence that keeps you living in as much of the house as possible.
Demolition, structure, rough-ins, inspections, then finishes. Changes go through you in writing before they happen.
A deficiency walk with you, a clean-up, and the handover of whatever paperwork the job produced.
Stand-in examples showing how a renovation project is documented. Real Reno the 6ix jobs replace these.
Pick the rooms, how far you want to go and roughly how big. You get the scale of the project, what to settle early and a price range, sent to your email.
A rough range from typical Greater Toronto Area prices: low-end to high-end materials, mid-range labour. No email needed. Nothing you enter leaves this page unless you send it to us.
The area you want finished, not counting the furnace room.
$ – $
CAD, before HST
Want a real number? We come out, measure and give you a written quote.
Get a proper estimateRough estimate only, not a quote. Based on typical Greater Toronto Area prices for comparable work in 2026. Your price depends on what we find on site.
It depends on the work. Cosmetic changes such as paint and flooring usually do not. Structural changes, new or moved plumbing and electrical, new openings, and basement conversions often do. Requirements vary by municipality and change over time, so confirm with your local building department. We will tell you early what we think your project involves.
Often, yes, for a kitchen, bathroom or single-room job, with some planning. Whole-floor and structural work is harder to live through. We talk through it at the walkthrough and plan around what you need to keep running.
Unknowns behind the walls, changes after work has started, and finishes that were left open. A good scope names the open items and allowances, and keeps changes in writing. Older Toronto houses have more of the first one.
By opening things up early where we can, and by telling you what we find as soon as we find it. If the plan has to change, you get the options and the cost before the work continues.
Yes. We also work with homeowners who do not have drawings yet. If you need a designer or engineer, we will say when, and what to ask them for.
Yes. Finish what is behind the wall first, or you will pay to open it again. If the basement has had water, we recommend a moisture assessment before the framing starts.
It depends on scope, permits, product lead times and what is behind the walls. A single bathroom is a very different job from a full floor. We give a planned sequence and an expected range at the scope stage, not a promise on the first call.
Use the planner to sketch out what you have in mind, or tell us directly. We walk the house before we put a scope in writing.